HS 84 – 85

Home & industrial electronics

Home and industrial electronics is the category where the product can be right and the shipment still be illegal. HS 84 and 85 carry more parallel regimes than anything else we move — electrical safety, EMC, energy labelling, chemicals, batteries, refrigerant, packaging and end-of-life — and every destination writes its own version of each one.

A circuit board, braided power cable and aluminium heatsink
§ What we trade

What we trade in this category

  • Small kitchen appliances every appliance type sits under its own part-2 standard, so a range of eight products is eight certification files, not one
  • Floorcare and cordless vacuums the lithium pack turns a simple appliance into a dangerous-goods consignment with its own test summary and packing instruction
  • Refrigeration and cold appliances the size of the hydrocarbon charge decides whether it ships as ordinary cargo or as UN 3358, and the model has to be in EPREL before it is placed on the market
  • Air treatment and climate sharply seasonal, cubes out a container long before it weighs out, and the air conditioners in it carry a mandatory energy label almost everywhere
  • Personal care electricals high value density and small cartons make air freight viable, which is what saves a missed season
  • Power tools and site equipment machinery obligations stack on top of the electrical ones and the instruction set becomes a legal document
  • Motors, pumps and compressors sold on a nameplate — duty type, IP rating, IE class, which Regulation (EU) 2019/1781 sets a legal floor for in the EU — and a wrong nameplate is a rejected consignment
§ How we select

How a supplier and a product get chosen.

01

Read the file first

Before the factory visit we ask for the CB test certificate and the full test report, not the certificate cover page. We check that the model designation on the report matches the model being quoted, that the report covers the voltage and frequency of the destination, and that the list of safety-critical components — thermal cutout, thermostat, capacitors, cordset, transformer — matches the bill of materials we have been sent.

02

Audit against the build

A factory audit that only looks at the production line tells you little. We look at incoming goods inspection records for the safety-critical parts, the hi-pot and earth-continuity test stations at end of line, and whether the test log is actually retained per unit or per shift. Where a supplier cannot show component traceability, the range does not go forward regardless of price.

03

Sample the destination

The golden sample is built to the destination specification — correct plug and cordset, correct voltage, correct rating label, correct manual language — not the factory's house version. We keep a sealed retained sample against which every later shipment is compared. Approval is recorded against a photographed and dimensioned sample, not an email saying the sample was fine.

04

Price the landed unit

The FOB price is the smallest part of the decision in this category. We build the landed cost with duty, the certification and testing spend amortised over the order, energy-label and producer-registration fees, recycling and packaging contributions, and the reverse-logistics provision the return rate on that product family actually justifies.

05

Contract the change

A design that passed type test still fails in the field once a component is substituted after approval. Supply agreements carry an engineering change clause that names the components that may not change without written approval and re-testing. The balance payment is tied to the pre-shipment inspection, so a substituted part is caught while the money is still ours.

§ Development

Development and design.

Design

Specification and variant matrix

We start from the destination list and work backwards into one specification with a controlled variant table: mains voltage and frequency, plug and cordset type, protective class, radio module where one is fitted, energy class target, and language set. Variants that can share a production run are grouped; variants that cannot — a hardwired difference in heater rating, a different compressor — are separated early, because discovering it at the pre-production sample stage costs a season.

Design

Tooling, materials and the critical BOM

Tooling ownership and location are agreed in writing before the first cavity is cut. On the bill of materials we fix the safety-critical parts by manufacturer and part number and hold the component certificates with the file. Enclosure materials are specified with the flammability class the standard requires rather than left to the moulder, and RoHS and REACH declarations are collected at component level so a substitution is visible.

Design

Packaging built for the lane

Packaging for this category is engineered against the transport, not the shelf. Cartons are drop and vibration tested to a recognised transit sequence, corner protection is specified for anything with a compressor or a motor, and the master carton is dimensioned to the pallet and the container so the load plan does not lose a layer. Where packaging rules in the destination restrict material or empty space, that is designed in at artwork stage rather than reworked in the warehouse.

Design

Rating label, manual and artwork

The rating label carries model, electrical rating, protective class symbol, IP rating where claimed, batch or serial number, the crossed-out wheeled bin where it applies, and the name and address of the party legally placing the product on that market. Manuals are translated by people who have used the appliance, then checked against the safety instructions the standard requires verbatim. Energy labels and product fiches are produced from the measured test data, not from the marketing target.

§ Our part

What we do that a broker does not.

A

We own the technical file

For our own brands we hold the technical documentation, the test reports and the declarations of conformity, and we keep them current when a standard is revised or a component changes. For a customer's own brand we build the file to hand over. Where the customer has no legal presence in the destination, our Portuguese entity can take the EU importer and Article 4 responsible-person role, and our Serbian entity the importer of record that Serbian rules require.

B

We run the registrations

Registrations are separate from certification and they are where shipments stall. We handle the producer registrations for electrical waste, packaging and batteries in each market, the energy-label product registrations, the destination conformity registrations — the Saudi shipment certificate of conformity issued per consignment through SABER, the Singapore controlled-goods registration, the mainland compulsory certification file — and we track their expiry dates against the shipping calendar.

C

We inspect before the money moves

We book third-party pre-shipment inspection on a sampling plan agreed with the buyer, and the report includes the electrical safety checks — earth continuity, dielectric strength, leakage — not only cosmetic and carton checks. Safety-critical components are physically verified against the certificate. The balance payment is released after the inspection passes; a failed lot is reworked and re-inspected at the supplier's cost.

D

We paperwork the freight

Lithium cells, packs and appliances containing them travel with a test summary and the correct packing instruction, and the state of charge limit for air is checked before the booking, not at the airport. Appliances with flammable hydrocarbon refrigerant are declared correctly for sea. We prepare the origin documents that preferential duty depends on, and we brief the destination broker before the vessel sails rather than after it arrives.

E

We carry the tail

Parts of this category carry a statutory repair obligation — the goods in Annex II of Directive (EU) 2024/1799 — and spare-part availability periods set by their ecodesign regulations. We hold spare-part stock for the parts that actually fail, keep the exploded views and service instructions with the file, and operate the return and warranty flow with the factory so a defect trend is fed back into the next production run instead of being absorbed by the distributor.

§ Documents

What the paperwork actually is.

The document set below is what this category needs to clear. We raise it rather than forwarding a checklist.

  • EU and EEA — CE marking under the Low Voltage Directive 2014/35/EU and the EMC Directive 2014/30/EU, plus the Radio Equipment Directive 2014/53/EU for anything with a wireless module, including the Article 3(3)(d) to (f) cybersecurity requirements applicable since 1 August 2025 under Delegated Regulation (EU) 2022/30 and the EN 18031 series and the Machinery Directive 2006/42/EC for equipment in its scope, replaced by Regulation (EU) 2023/1230 from 20 January 2027. Supported by an EU declaration of conformity, a technical file, test reports to the applicable EN IEC 60335 parts, EN IEC 62841 for power tools and EN IEC 62368-1 for the electronics, with EN 55014-1 and -2 for emission and immunity and EN IEC 61000-3-2/-3-3 for harmonics and flicker, RoHS Directive 2011/65/EU and REACH compliance, Ecodesign under Regulation (EU) 2024/1781 and its product-specific implementing regulations, the Energy Labelling Regulation (EU) 2017/1369 with the model registered in EPREL before the first unit is placed on the market, WEEE registration in each member state, Regulation (EU) 2023/1542 on batteries, the General Product Safety Regulation (EU) 2023/988, an Article 4 responsible person established in the Union under Regulation (EU) 2019/1020, the packaging requirements of Regulation (EU) 2025/40 applying from August 2026, and, for equipment pre-charged with HFCs, the quota, declaration of conformity and verification the F-gas Regulation (EU) 2024/573 requires at import.
  • Serbia and the Western Balkans — the Serbian rulebooks on electrical equipment within certain voltage limits and on electromagnetic compatibility, published in the Official Gazette and aligned with the EU directives. The Serbian 3A conformity mark, a declaration of conformity issued in Serbian, instructions and safety warnings in Serbian, and the importer's name and address on the product or its packaging. Preferential duty into Serbia depends on origin evidence under the Stabilisation and Association Agreement or CEFTA; Serbia also has free trade agreements in force with China, Turkey and the EAEU; the Chinese schedule zeroes some lines on entry into force and phases others over five or ten years, so the arithmetic is checked line by line.
  • Hong Kong and Singapore — in Hong Kong, the Electrical Products (Safety) Regulation, Cap. 406G, under which prescribed household products need a certificate of safety compliance and a fused plug to BS 1363 or BS 546, with two-pin BS 4573 plugs only on shaver supplies; Hong Kong is a free port, so the constraint is conformity and not duty. In Singapore, the Consumer Protection (Safety Requirements) Regulations, under which controlled goods must be registered by a registered supplier against a certificate of conformity from a designated body or a supplier's declaration, and carry the SAFETY Mark with its registration number; energy labelling and minimum performance standards administered by the National Environment Agency apply to air conditioners, refrigerators, dryers, televisions and lamps.
  • Mainland China — China Compulsory Certification for catalogued products, tested to the GB 4706 household appliance safety series and GB 4343.1 for emissions, with factory inspection as part of the certificate. The China Energy Label filing for products in scope, China RoHS marking and disclosure under SJ/T 11364, and a Chinese-language instruction manual and label meeting the national requirements. Import clearance turns on the HS classification, the declared elements matching the certificate, and the certificate covering the exact model and factory.
  • The Gulf — the GCC technical regulation for low-voltage electrical equipment and the G-Mark, supported by a certificate of conformity from a notified body. For Saudi Arabia, registration through the SABER platform with a product certificate of conformity and a shipment certificate of conformity issued per consignment, and SASO energy efficiency labelling for air conditioners, refrigerators, washing machines and other listed appliances. For the UAE, conformity through the emirates scheme administered by the Ministry of Industry and Advanced Technology, with its own energy efficiency label. Arabic labelling and Arabic instructions are a customs matter, not a courtesy.
  • Cross-cutting freight and substance documents — a UN 38.3 test summary for every lithium cell, pack and appliance containing one, with the correct UN number and packing instruction, and the 30% state-of-charge limit where PI 965 or PI 966 applies; correct declaration for appliances charged with flammable hydrocarbon refrigerant; safety data sheets where required; RoHS and heavy-metal test reports supporting the declarations; transit testing evidence for the packaging; and the inspection standard and acceptance levels named in the purchase contract rather than assumed.
§ Corridors

How it moves.

This category moves in both directions. Finished appliances and small electricals run from Greater China through Hong Kong into the EU, Serbia and the Western Balkans and the Gulf — deep-sea to North European and Adriatic ports for volume, rail or air for seasonal replenishment and for the high-value-density lines, with Serbian and Portuguese stock held close to the buyers who cannot wait for a vessel. In the other direction, European and Eastern European industrial equipment, motors and components move into Hong Kong, Singapore and mainland China, where the work is less about duty — Hong Kong charges none — and more about getting the conformity mark, the local-language documentation and the classification right before the goods leave.

See the lanes we run

§ Questions

What buyers ask first.

Can you make one production run serve the EU, Serbia and the Gulf?

Partly. The core appliance can usually be common, and the differences fall in the cordset and plug, the rating label, the manual and the packaging artwork, which we split at the packing stage. What cannot be shared is the paperwork: each market needs its own conformity route, its own registrations, and for Saudi Arabia a certificate issued against the shipment itself. We plan the run as one build with separate finishing and separate document sets.

Who holds the certification — us or you?

It depends on whose name goes on the product. For our own brands we hold the technical file and the declarations and we carry the legal obligations that go with them. For your brand, the file is built to be yours and is handed over with the test reports and component certificates. Where you have no legal entity in the destination, our Portuguese company can be the EU importer and Article 4 responsible person, and our Serbian company the importer of record for Serbia.

What actually stops a factory changing a component after approval?

Nothing does on its own — the control is contractual and physical. The supply agreement names the safety-critical components that may not change without written approval and re-testing, and it makes an unapproved change a rejection ground rather than a discussion. The pre-shipment inspection physically checks those parts against the certificate and the retained golden sample, and the balance payment is released only when it passes.

We can buy FOB and handle compliance ourselves. Why wouldn't we?

If you already hold the producer registrations in the destination, have a technical file you can defend to a market surveillance authority, and can absorb a lot being detained while a certificate is corrected, buying FOB is a reasonable choice and we will quote it. Most buyers discover the cost in the exceptions — an energy label not registered before the model was placed on the market, a battery test summary that names a cell the factory stopped using, a shipment certificate applied for after the vessel sailed. What we are selling in this category is the file and the gate on the payment, not the box.

§ Other sectors

Moving home & industrial electronics?

Tell us the product, the origin and the destination. We come back with the classification, the document set and a realistic timeline.

Open a file with us
§ Two minutes

Not ready to write a brief?

Leave three lines and we will come back with the corridor, the customs position and a realistic timeline for whatever you are moving.

Please enter your company.
Please enter your name.
Please enter a valid email address.

Sent


        
Select Language